TOP PROJEKT d.o.o.
HOME|ABOUT US|CONTACT|HRVATSKI

PORT of KOPER, Koper, SLOVENIA-Terminal for liquid chemicals 1998-1999

LUKA KOPER, Koper, SLOVENIJA - Terminal tekućih kemikalija 1998-1999.LUKA KOPER, Koper, SLOVENIJA - Terminal tekućih kemikalija 1998-1999.

Design for the tanks:

  • V=3 x 500 m3, stainless steel
  • V=2 x 1.500 m3, stainless steel

Reconstruction of the tanks:

  • R-203, 205 i 208 V=630 m3, each
  • R-101, V=1.000 m3
  • R-207, V=1.220 m3
  • R-202, V=2.170 m3

Design for PIG pipeline:

closed system for two PIG pipelines dimension 6''
and 4'' (more mediums trough the same pipeline),
2 independent pipelines


Design for the truck tanks loading unit:

  • 2 measuring lines for bottom loading

The complete design documentation for manipulative pipelines and accessory infrastructure for the above stated units (fire protection system, civil engineering units, electrical design, designs for measurement and regulations, environmental protection.)






PHOTOGRAPHS >>>


  REFERENCES

TOP PROJEKT d.o.o.
Jagodišće 7
HR - 10090 Zagreb
TEL:
+385 1 3491 250
+385 1 3491 386
FAX:
+385 1 3491 234
+385 1 3491 896
e-mail:
top-projekt@inet.hr

HOME|ABOUT US|CONTACT|HRVATSKI
STUDIO PRO PLUS